Reorder point formula: lead time, safety stock, examples
Reorder point = average daily sales × lead time in days + safety stock. Sell 12 a day, wait 9 days for the supplier, keep 30 in reserve, and you reorder at 138. Here is where each number comes from, three ways to size safety stock, and the mistakes that cause stockouts anyway.
The formula
Reorder point = (average daily sales × lead time in days) + safety stockThe first part is the stock you will sell while you wait for the delivery. The second is a buffer for the days when you sell faster than average or the supplier is late. When stock on hand falls to the reorder point, you place the order — and if both numbers were right, the new stock arrives as the shelf reaches the buffer.
Example: you sell 12 a day, the supplier takes 9 days from order to your shelf, and you keep 30 as safety stock. 12 × 9 = 108, plus 30, is a reorder point of 138. Try your own numbers in the reorder point calculator.
Getting the inputs right
- Daily sales from recent orders, per variant. A t-shirt that sells 12 a day may be selling 7 mediums and 1 extra-small. The reorder point belongs to the SKU, not the parent product.
- Lead time from order to sellable. Not the supplier’s quoted production time — the days from the moment you send the order to the moment the units are counted and on the shelf, including shipping, customs and receiving.
- Days you were out of stock don’t count. A product that sold nothing for a week because there was nothing to sell did not have zero demand. Leave those days out of the average or it drags the reorder point down — and causes the next stockout.
Three ways to size safety stock
Using the same product — average 12 a day, worst recent day 18, lead time 9 days usually and 12 at worst:
| Method | Formula | Example |
|---|---|---|
| Percentage of lead-time demand | lead-time demand × % | 108 × 25% = 27 |
| Max minus average | (max daily sales × max lead time) − (average daily sales × average lead time) | (18 × 12) − (12 × 9) = 108 |
| Service level | Z × standard deviation of daily sales × √lead time | 1.65 × 4 × √9 = 19.8 → 20 |
The percentage method is simple and easy to explain. Max-minus-average assumes the worst sales day and the worst delivery happen together, which is safe and expensive — 108 units of buffer here, as much as the whole lead-time demand. The service-level method is the one inventory textbooks use: Z is the number of standard deviations you want to cover (1.65 for about 95% of lead times without a stockout, 2.33 for about 99%), and the standard deviation is measured from your daily sales. It needs a few months of history to mean anything. The safety stock calculator does all three.
Reorder point, order quantity and days of inventory
The reorder point says when to order, not how much. The quantity is a separate decision: enough to cover the lead time plus the period until the next order, or the economic order quantity if ordering costs are significant — the EOQ calculator balances the cost of placing orders against the cost of holding stock.
Two numbers that answer the question from the other side:
- Days of stock left = stock on hand ÷ average daily sales. 300 units at 12 a day is 25 days. If that is fewer than your lead time plus your buffer, you are already late.
- Days in inventory (an accounting measure) = average inventory value ÷ cost of goods sold × 365. It tells you how long, on average, cash sits on the shelf. It goes with inventory turnover and sell-through rate.
Keeping it current in WooCommerce
A reorder point is only right while sales stay where they were when you calculated it. A spreadsheet updated once a quarter is wrong for the product that took off last month — which is exactly the product you can least afford to run out of.